Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberGCB14-00014
StatusFinaled
Name Blackstead Building Co.
Site Address 9789 W TRIBUTARY
Project NameBLD2014-00014
Customer Number 
ePlanReviewNo
Description
(Payette Townhome) - To construct a new 1,950 square foot, one story, two bedroom, two bathroom, single family dwelling townhouse with a 678 square foot attached two car garage, a 337 square foot courtyard, and a 193 square foot covered rear patio. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This structure is located in the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final10/21/201410/22/201410/22/2014PPASS
DetailsJim Sly
Mike ###-####
GCB-Final8/27/20148/28/20148/28/2014AFAIL
DetailsMike Jordan
Mike Brown ###-####. please call for access. Provide tempered glazing at window next to door into courtyard from masterbedroom.
GCB-Final8/27/20148/27/20148/27/2014PNH
DetailsMike Jordan
Mike Brown ###-####. No access. Called Mike, no awnser. Will have to reschedule.
GCB-Fndatn/slab ins/fld vent5/20/20145/20/20145/20/2014PPART
DetailsJim Sly
Mike Brown ###-####
This Was Interior Sheetrock Nailing for Wall Bracing.........OK
GCB-Framing5/13/20145/13/20145/13/2014PPASS
DetailsDave Hannah
Mike ###-####
GCB-Energy5/13/20145/13/20145/13/2014PPASS
DetailsDave Hannah
Mike ###-####
GCB-Framing5/8/20145/9/20145/12/2014PPART
DetailsDave Hannah
Mike ###-#### c/n on site ok to insulate
GCB-Shearwall5/1/20145/2/20145/2/2014APASS
DetailsTom Arcoraci
Mike Brown ###-####
GCB-Fire Wall3/20/20143/21/20143/21/2014APART
DetailsDave Hannah
Mike ###-#### firewall only east side ok
GCB-Footing2/21/20142/24/20142/24/2014APASS
DetailsMike Jordan
Adam ###-#### Call first