Permit Information
Permit NumberGCB14-00017
StatusFinaled
Name French Homes Inc.
Site Address 460 E 51ST
Project NameBLD2014-00017
Customer Number 
ePlanReviewNo
Description
(Lot 7 Townhome) - To construct a new 3,527 square foot, Two story, Four bedroom, two and a half bathroom, single family dwelling townhouse with a 416 square foot attached garage, a 48 square foot covered front patio, and a 48 square foot covered rear patio. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This structure is located in the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final7/21/20147/22/20147/22/2014PPASS
DetailsJim Sly
Dan ###-####
GCB-Framing6/13/20146/13/20146/19/2014PDEFR
DetailsDave Hannah
Dan ###-#### plans in fireplace at 460 51st
GCB-Energy6/13/20146/13/20146/19/2014PDONE
DetailsDave Hannah
Dan ###-####
GCB-Framing6/17/20146/17/20146/17/2014PCANC
DetailsMike Jordan
Dan ###-#### plans in fireplace
GCB-Energy6/17/20146/17/20146/17/2014PPASS
DetailsMike Jordan
Dan ###-#### plans in fireplace
GCB-Framing6/11/20146/12/20146/12/2014PPART
DetailsDave Hannah
DAN FRENCH ###-#### c/n on site ok to insulate afer elec rough in is signed off
GCB-Shearwall5/2/20145/2/20145/2/2014PPASS
DetailsTom Arcoraci
Dan ###-#### re-inspect
GCB-Shearwall4/30/20145/1/20145/1/2014PFAIL
DetailsMike Jordan
Dan 602.3255. Please provide approved plans. Also provide 5/8type x rock at soffits at 2hr. firewalls. Correction notice posted.
GCB-Fire Wall4/9/20144/9/20144/9/2014PPASS
DetailsMike Jordan
Dan ###-#### first layer on, check nailing before second layer. Base layer, 1st. floor ok.
GCB-Footing3/12/20143/12/20143/12/2014PPASS
DetailsJim Sly