GCB-Final | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Jim Sly
|
|
|
Mike ###-#### call for codes
|
GCB-Shearwall | 7/24/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Mike Jordan
|
|
|
Mike ###-####. Interior gypboard wall bracing ok.
|
GCB-Energy | 7/18/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Tony Young
|
|
|
Mike ###-####,, frame and energy ok to cover
|
GCB-Shearwall | 7/18/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Tony Young
|
|
|
Mike ###-#### truss drawings next to furnace in garage
|
GCB-Shearwall | 7/17/2014 | 7/18/2014 | 7/18/2014 | A | FAIL |
Mike Jordan
|
|
|
Mike ###-####. Several areas where staples are missing and overspaced. Review wall bracing plan.
|
GCB-Shearwall | 7/16/2014 | 7/17/2014 | 7/17/2014 | A | PART |
Tony Young
|
|
|
contractor mentioned shearwall, rough-in, structural correction notice posted-truss eng, verifiy trades, nail hangers, renail shear per plans, ok to insulate
|
GCB-Shearwall | 6/19/2014 | 6/19/2014 | 6/20/2014 | P | PART |
Tony Young
|
|
|
Mike ###-####,, upper firewall ok
|
GCB-Fire Wall | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Jim Storey
|
|
|
Mike ###-####
|
GCB-Fndatn/slab ins/fld vent | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PASS |
Jim Sly
|
|
|
MATT ###-####
|
GCB-Footing | 5/9/2014 | 5/12/2014 | 5/12/2014 | P | PASS |
Jim Sly
|
|
|
Matt ###-####
|