GCB-Final | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Jim Sly
|
|
|
Mike ###-#### call for codes
|
GCB-Shearwall | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | PASS |
Tony Young
|
|
|
Mike ###-####,, interior shear ok
|
GCB-Framing | 7/11/2014 | 7/11/2014 | 7/14/2014 | P | PASS |
Dave Hannah
|
|
|
Mike ###-#### framing and insulation ok ok to sheetrock
|
GCB-Shearwall | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | FAIL |
Mike Jordan
|
|
|
structural rough in-shearwall on the out side plans are in the box by furnace
Mike ###-####. Exterior wall bracing ok. Provide full height blocking for t16 trusses in garage above man door. Strap double top plates at interior bearing wall at vent. Repair fireblocking at plumbind and electrical penetration, either side of fireplace. Foam low voltage wires at top plate. Correction notice posted. Ok to insulate.
|
GCB-Shearwall | 6/19/2014 | 6/19/2014 | 6/20/2014 | P | PART |
Tony Young
|
|
|
Mike ###-####,, upper firewall
|
GCB-Fire Wall | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Jim Storey
|
|
|
Mike ###-####
|
GCB-Fndatn/slab ins/fld vent | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | PASS |
Jim Sly
|
|
|
MATT ###-####
|
GCB-Footing | 5/9/2014 | 5/12/2014 | 5/12/2014 | P | PASS |
Jim Sly
|
|
|
Matt ###-####
|