Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberGCB14-00079
StatusFinaled
Name ASIN HOMES LLC
Site Address 3602 N PROSPECT WAY
Project NameBLD2014-00079
Customer Number 
ePlanReviewNo
Description
Lot 9 Townhouse - To construct a new 2,056 square foot, Three story (347 square foot 1st story / 877 square foot 2nd story / 832 square foot 3rd story), two bedroom, three and one half full bathroom, single family dwelling townhouse with a 420 square foot attached garage, a 96 square foot covered rear 2nd story balcony, a 96 square foot covered rear 3rd floor balcony, and a 12 square foot covered stoop. All work per the approved plans, attached plan review report, engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. FEMA (LOMR-F) determination letter attached to plans removing this property from the floodplain. ENGINEERED DESIGN FOR SHEAR WALLS PER DESIGN PROFESSIONAL. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/11/20153/11/20153/11/2015PPASS
DetailsDave Hannah
Todd ###-#### - code: 0901
GCB-Final3/6/20153/6/20153/9/2015PFAIL
DetailsDave Hannah
Todd ###-#### code: 0901 needs temp glass at landing
GCB-Energy11/19/201411/20/201411/20/2014PPASS
DetailsDave Hannah
###-####
GCB-Energy11/17/201411/18/201411/18/2014ANR
DetailsDave Hannah
###-####
GCB-Energy11/17/201411/17/201411/17/2014PNR
DetailsDave Hannah
###-####
GCB-Framing11/13/201411/14/201411/14/2014PPASS
DetailsDave Hannah
###-####
GCB-Framing11/13/201411/13/201411/14/2014PPASS
DetailsDave Hannah
###-####
GCB-Shearwall10/30/201410/30/201410/30/2014PPASS
DetailsDave Hannah
###-####
GCB-Fndatn/slab ins/fld vent9/3/20149/4/20149/4/2014PPASS
DetailsJim Sly
Ryan ###-#### PM foundation onspection
GCB-Footing9/2/20149/3/20149/3/2014APASS
DetailsDave Hannah
Ryan ###-#### want to pour late AM