Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberGCB14-00106
StatusFinaled
Name French Homes Inc.
Site Address 484 E 51ST
Project NameBLD2014-00106
Customer Number 
ePlanReviewNo
Description
(Lot 11 Townhome) - To construct a new 1,594 square foot, Two story, (605 sq.ft. 1st Story / 989 sq.ft. 2nd Story), Three bedroom, two and a half bathroom, single family dwelling townhouse with a 379 square foot attached garage, a 28 square foot covered front patio, and a 40 square foot covered rear patio. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This structure is located in the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final5/12/20155/13/20155/13/2015APASS
DetailsDave Hannah
Dan ###-####
GCB-Energy3/30/20153/30/20153/30/2015PPASS
DetailsDave Hannah
Dan ###-####
GCB-Framing3/25/20153/25/20153/25/2015PPASS
DetailsPhil Shearer
Dan ###-####
GCB-Shearwall3/25/20153/25/20153/25/2015PPASS
DetailsPhil Shearer
Dan ###-####
GCB-Shearwall9/30/20149/30/20149/30/2014PFAIL
DetailsDave Hannah
Dan French ###-####
GCB-Fire Wall9/17/20149/17/20149/17/2014PPART
DetailsDave Hannah
Dan 6023255 first floor first layer of sheetrock ok to cover with second layer.
GCB-Fndatn/slab ins/fld vent8/13/20148/13/20148/13/2014PPASS
DetailsDave Hannah
PM foundation inspection requested ###-####
GCB-Footing8/12/20148/12/20148/13/2014PDONE
DetailsDave Hannah
Huron ###-####
GCB-Footing8/12/20148/13/20148/13/2014APASS
DetailsJim Sly
Huron ###-####