GCB-Final | 1/15/2015 | 1/15/2015 | 1/16/2015 | A | DONE |
Dave Hannah
|
|
|
INSPECTOR (J. SLY) RESCHEDULED INSPECTION WITH CONTRACTOR DIRECTLY - NO RESCHEDULE RECEIVED BY GC OFFICE
|
GCB-Final | 1/14/2015 | 1/15/2015 | 1/16/2015 | P | PASS |
Jim Sly
|
|
|
Terry 888 5285
|
GCB-Final | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | PEND |
Jim Sly
|
|
|
Terry Hagan ###-#### - re-roof insp. Re-scheduled for Thurs..........
|