GCB-Final | 7/22/2015 | 7/23/2015 | 7/23/2015 | P | PASS |
Dave Hannah
|
|
|
Travis ###-#### please call ahead. he is supposed to call in life/safety for 7/23 AM
|
FIRE-Final Inspection | 7/22/2015 | 7/23/2015 | 7/23/2015 | P | PASS |
Katie Marron
|
|
|
Life safety pass.
|
GCB-Ceiling Grid | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | PASS |
Dave Hannah
|
|
|
Travis ###-#### - requested call ahead
|
GCB-Energy | 6/3/2015 | 6/4/2015 | 6/4/2015 | A | PASS |
Mike Jordan
|
|
|
Travis ###-####
|
GCB-Energy | 6/1/2015 | 6/2/2015 | 6/3/2015 | A | NR |
Jim Sly
|
|
|
Travis ###-####
|
GCB-Framing | 5/29/2015 | 6/1/2015 | 6/1/2015 | A | PASS |
Jim Sly
|
|
|
Travis ###-#### Plans do not have all pages stamped PDS. Called G C (Keegan) .....These are the plans that Boise sent to them. Allowed Contr. to Rock all areas .....after Electr R/I approval ......Except areas that require insulation. Contr. to call for Energy Code insp. when ready.
|
GCB-Framing | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | NR |
Mike Jordan
|
|
|
Travis ###-####. No approved plans on site.
|
GCB-Footing | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PASS |
Phil Shearer
|
|
|
Travis ###-#### - requested 1hr call ahead
|