GCB-Final | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | PASS |
Tony Young
|
|
|
###-#### - Abigail - call ahead 30min.
|
FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 | P | CANC |
Katie Marron
|
|
|
Fire Final already completed on 1/12/16. NAF permit has been finaled. Called Norma ###-#### and discussed that she needs the BLD final instead.
|
FIRE-Final Inspection | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Katie Marron
|
|
|
Life safety completed satisfactory.
|
GCB-Framing | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | PASS |
Dave Hannah
|
|
|
Steve ###-#### - 1/2hr call ahead for access back wall for hood steelstuds ok to cover
|
GCB-Framing | 11/13/2015 | 11/16/2015 | 11/16/2015 | A | NH |
Mike Jordan
|
|
|
Steve ###-#### - back door open. No one on site. ALL DOORS WERE LOCKED.
|