GCB-Final | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Jim Sly
|
|
|
Scott ###-#### - code: 2746
|
GCB-Final | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | NR |
Jim Sly
|
|
|
Scott ###-#### - code: 2746 Contractor office# ###-#### Walk thru......Not ready. Need Plumb final, Fire Final? Guards on Stairway and decks. Landings at doorways. Bottom riser at stairway to 2nd floor over 7 3/4 " Doing final coat on stucco now.
|
GCB-Energy | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PASS |
Mike Jordan
|
|
|
Todd ###-#### - exterior insulation and sheetrock
|
GCB-Energy | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PASS |
Mike Jordan
|
|
|
Todd ###-####. Al framing issues were resolved. Plumbing rough in inspection done. Energy code ok.
|
GCB-Framing | 1/6/2016 | 1/6/2016 | 1/6/2016 | P | PART |
Jim Sly
|
|
|
Todd ###-#### C/N issued .....Stair issues, hold downs, bored parralam in garage.
|
GCB-Framing | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | DONE |
Dave Hannah
|
|
|
Todd ###-#### - FRAMING CONSULTATION ONLY needs engineering to drill beams
|
GCB-Fndatn/slab ins/fld vent | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Phil Shearer
|
|
|
Manuel ###-####
|
GCB-Footing | 9/14/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Jim Sly
|
|
|
Ryan ###-####
|
GCB-Footing | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | FAIL |
Mike Jordan
|
|
|
Ryan ###-####. F8 column pad footing missing rebar, Center footings needs #4 verts at 32" o.c. Correction notice posted.
|
GCB-Footing | 9/10/2015 | 9/11/2015 | 9/11/2015 | P | NR |
Mike Jordan
|
|
|
Ryan ###-####. No approved plans or engineering on site. No concrete allowed at this time. Will need to reschedule.
|
GCB-Footing | 8/14/2015 | 8/17/2015 | 8/17/2015 | P | CANC |
Dave Hannah
|
|
|
Ryan ###-####
|