Permit Information
Permit NumberGCB15-00035
StatusFinaled
Name ASIN GENERAL CONTRACTORS
Site Address 3594 N PROSPECT
Project NameBLD2015-00035
Customer Number 
ePlanReviewNo
Description
Lot 6 Townhouse - To construct a new 2,118 square foot, Three story (456 square foot 1st story / 822 square foot 2nd story / 840 square foot 3rd story), two bedroom, three and one half full bathroom, single family dwelling townhouse with a 445 square foot attached garage, a 96 square foot covered rear 2nd story balcony, a 96 square foot covered rear 3rd floor balcony, and a 12 square foot covered stoop. All work per the approved plans, attached plan review report, engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. FEMA (LOMR-F) determination letter attached to plans removing this property from the floodplain. ENGINEERED DESIGN FOR SHEAR WALLS PER DESIGN PROFESSIONAL. NOTE: This house shall be fitted with a sprinkler system and WILL REQUIRE A SEPARATE PERMIT, and shall be installed per NFPA #13D as regulated by N.A.C.F.R. rules.**SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final7/25/20167/26/20167/26/2016APASS
DetailsDave Hannah
Scott ###-#### - code: 2746
GCB-Final7/21/20167/22/20167/22/2016ANR
DetailsDave Hannah
Scott ###-#### - code: 2746
GCB-Final7/19/20167/20/20167/20/2016AFAIL
DetailsDave Hannah
Scott ###-#### - code: 2746 c/n on site
GCB-Final7/18/20167/18/20167/18/2016PNR
DetailsDave Hannah
Scott ###-#### - code: 2746
GCB-Energy1/22/20161/22/20161/22/2016PPASS
DetailsDave Hannah
Todd ###-####
GCB-Framing1/20/20161/21/20161/21/2016APASS
DetailsMike Jordan
Todd ###-####
GCB-Framing1/19/20161/20/20161/20/2016APART
DetailsMike Jordan
Todd ###-####. Nail off all simspon hangars. Remove plumbing vent from 4ft. laydown parapet. Complete foam seal. Ok to insulate only after a fire sprinkler rough in inspection and tenting have been completed.
GCB-Shearwall12/9/201512/9/201512/10/2015PDONE
DetailsDave Hannah
Todd ###-####
GCB-Shearwall12/9/201512/9/201512/9/2015PPASS
DetailsDave Hannah
Todd ###-####
GCB-Fndatn/slab ins/fld vent9/17/20159/18/20159/18/2015APASS
DetailsPhil Shearer
Manuel ###-####
GCB-Footing9/14/20159/15/20159/15/2015PPASS
DetailsJim Sly
Ryan ###-####
GCB-Footing9/11/20159/14/20159/14/2015AFAIL
DetailsMike Jordan
Ryan ###-####. F8 column pad footing missing rebar, Center footings needs #4 verts at 32" o.c. Correction notice posted.
GCB-Footing9/10/20159/11/20159/11/2015PNR
DetailsMike Jordan
Ryan ###-####. No approved plans or engineering on site. No concrete allowed at this time.
GCB-Footing8/14/20158/17/20158/17/2015PCANC
DetailsDave Hannah
Ryan ###-####