GCB-Final | 6/18/2015 | 6/18/2015 | 6/22/2015 | P | PASS |
Dave Hannah
|
|
|
electical and plumbing completed/passed
|
GCB-Final | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PART |
Jim Sly
|
|
|
Earl ###-#### - block and tie insp. Block and Tie downs .....OK. OK to skirt .......after verifying Electr and Plumb. approved.
|