GCB-Final | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Jim Sly
|
|
|
Manny ###-#### - code: 9981
|
GCB-Framing | 10/28/2015 | 10/27/2015 | 10/28/2015 | P | DONE |
Dave Hannah
|
|
|
Manny ###-####
|
GCB-Framing | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | PART |
Jim Sly
|
|
|
Frame And Energy.....OK.
|
GCB-Framing | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PART |
Jim Sly
|
|
|
Manny ###-#### OK to insulate.......But need to correct some fireblocking, truss bearing N. wall. Will check at Energy code Insp.
|
GCB-Courtesy | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | DONE |
Jim Sly
|
|
|
Manny ###-#### - requested call ahead
|
GCB-Fire Wall | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | FAIL |
Tony Young
|
|
|
Manny ###-####,, correction notice posted,, too many gaps,, overlaps on drywall on some areas not there,, nailing missing
|
GCB-Shearwall | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | FAIL |
Tony Young
|
|
|
Manny ###-####,, correction posted,, re-do per plans,, too much missing
|
GCB-Footing | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Dave Hannah
|
|
|
###-####
|
GCB-Fndatn/slab ins/fld vent | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | PASS |
Dave Hannah
|
|
|
###-####
|
GCB-Footing | 6/19/2015 | 6/22/2015 | 6/22/2015 | P | PART |
Tony Young
|
|
|
###-####0,,work in progress,, need to be min 8" thick on main footings
|
GCB-Footing | 6/18/2015 | 6/19/2015 | 6/19/2015 | P | NR |
Mike Jordan
|
|
|
###-####. No one on site, work not started.
|