GCB-Final | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Jim Sly
|
|
|
Lori ###-#### - requested insp. after 9a.m. Structural Final OK.
|
FIRE-Final Inspection | 9/14/2015 | 9/15/2015 | 9/16/2015 | A | PASS |
Katie Marron
|
|
|
Life safety pass.
|
FIRE-Final Inspection | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | FAIL |
Katie Marron
|
|
|
Renonvations to existing sprinkler system are required for walk in coolers.
|
GCB-Final | 7/9/2015 | 7/13/2015 | 7/13/2015 | P | PEND |
Dave Hannah
|
|
|
###-#### needs fire finals ada countertop at sales and key lock on front door
|
GCB-Final | 6/8/2015 | 6/9/2015 | 6/9/2015 | A | NR |
Jim Sly
|
|
|
(Business Owner) Lori ###-#### - requested 1hr call ahead Called Keegan At Garden City.../.She said there has been No inspections at this jobsite. I advised Lori.....the owner of this an told her it was the responsibility of the persons doing the work to obtain permits and all required inspections. She said she would call all responsible parties.
|