GCB-Final | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Jim Sly
|
|
|
Mark ###-#### Structural final only......OK.
|
FIRE-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PASS |
Katie Marron
|
|
|
Lights have been repaired. Fire life safety pass.
|
FIRE-Final Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PART |
Katie Marron
|
|
|
Fire Life Safety Pass pending repair of three "bug eye" emergency light fixtures.
|
GCB-Final | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | NR |
Phil Shearer
|
|
|
Kevin ###-#### - requested call ahead
|
GCB-Framing | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PASS |
Dave Hannah
|
|
|
Kevin ###-#### - requested call ahead
|