GCB-Final | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Dave Hannah
|
|
|
Scott ###-#### - FINAL FOR PERM. OCCUPANCY
|
GCB-Final | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | PART |
Mike Jordan
|
|
|
Scott ###-####. Ok for temp. occupancy. Will be ok for perm. occupancy once zoning and fire/life/safety sing for perm. occupancy. (these gave temps. for know)
|
FIRE-Final Inspection | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete with exception to the communicator, current monitoring setup is through phone line, a wireless communicator will take its place once a permit is issued and inspected, fire extinguishers are in place with current inspection tags, Final life fire safety inspection complete with exception to fire alarm communicator, once permit is finaled for communicator the life fire safety can be finaled.
|
GCB-Ceiling Grid | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Mike Jordan
|
|
|
Scott ###-#### - requested insp. after 1p.m.
|
GCB-Energy | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Jim Sly
|
|
|
Scott ###-#### - coverage on interior insulation
|
GCB-Energy | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | PASS |
Dave Hannah
|
|
|
Scott ###-####
|
GCB-Framing | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Jim Sly
|
|
|
Scott ###-####
|
GCB-Shearwall | 1/25/2016 | 1/26/2016 | 1/26/2016 | P | PASS |
Jim Sly
|
|
|
Scott ###-####
|
GCB-Framing | 1/25/2016 | 1/26/2016 | 1/26/2016 | P | PASS |
Jim Sly
|
|
|
Scott ###-####
|
GCB-Fndatn/slab ins/fld vent | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PART |
Jim Sly
|
|
|
Scott ###-#### - slab insp. Slab OK pending MTI special inspection, tests and approvals.
|
GCB-Fndatn/slab ins/fld vent | 12/13/2015 | 12/14/2015 | 12/14/2015 | A | DONE |
Dave Hannah
|
|
|
Scott ###-#### spec inspection will do final before placement
|
GCB-Footing | 12/9/2015 | 12/9/2015 | 12/10/2015 | P | DONE |
Dave Hannah
|
|
|
Scott ###-#### - rebar and footing
|
GCB-Footing | 12/9/2015 | 12/9/2015 | 12/9/2015 | P | PEND |
Dave Hannah
|
|
|
Scott ###-#### ok after mti final signoff
|
GCB-Courtesy | 12/2/2015 | 12/3/2015 | 12/3/2015 | A | DONE |
Jim Sly
|
|
|
Scott ###-#### Pre- constr conf.......Talked about cold weather concrete provisions. Gave Scott copy of Bldg Safety Collaborative interpretation handout on topic. MTI is hired to perform all special inspections.
|