GCB-Final | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Dave Hannah
|
|
|
Grey ###-#### - code: 3380
|
GCB-Final | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | FAIL |
Dave Hannah
|
|
|
Grey ###-#### - lockbox at power meter: 3380 needs tempered glass master bath
|
GCB-Energy | 3/1/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Dave Hannah
|
|
|
Grey ###-####
|
GCB-Framing | 2/24/2016 | 2/25/2016 | 2/26/2016 | A | PART |
Dave Hannah
|
|
|
Grey ###-#### ok to insulate fix headroom at bottom of stairs and floor truss cut by plumbing
|
GCB-Shearwall | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PASS |
Jim Sly
|
|
|
Grey ###-####
|
GCB-Energy | 12/2/2015 | 12/2/2015 | 12/3/2015 | P | PASS |
Dave Hannah
|
|
|
Grey ###-#### - slab insulation
|
GCB-Fndatn/slab ins/fld vent | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PART |
Dave Hannah
|
|
|
Heron ###-#### - requested 3:30p.m. inspection
|
GCB-Footing | 10/30/2015 | 10/30/2015 | 10/30/2015 | P | PASS |
Jim Sly
|
|
|
Heron ###-#### - requested 3:30p.m. insp.
|