GCE-Temporary Service | 8/27/2009 | 8/27/2009 | 8/27/2009 | P | PASS |
Doug A Poedy
|
|
|
terry ###-####. T/S U/G connect ok.
|
GCE-Temporary Service | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | FAIL |
Doug A Poedy
|
|
|
Terry Phone #: ###-####. NEC 300.5 Conduit not deep enough. Idaho Power wants temp power pole moved next to Idaho Power j-box.
|