GCE-Rough-In | 4/7/2010 | 4/8/2010 | 4/8/2010 | A | PASS |
Doug A Poedy
|
|
|
Scope of inspection: Rough-in/FinalContact :Amy @ ###-####For Exhaust System InstallationElectrician: Brad @ ###-####Don @ ACHD ###-####
|
GCE-Final | 4/8/2010 | 4/8/2010 | 4/8/2010 | P | PASS |
Doug A Poedy
|
|
|
Scope of inspection: Rough-in/FinalContact :Amy @ ###-####For Exhaust System InstallationElectrician: Brad @ ###-####Don @ ACHD ###-####
|
GCE-Final | 4/1/2010 | 4/6/2010 | 4/6/2010 | A | CANC |
Jack Frank
|
|
|
(Mandatory Inspection) Scope of inspection: Final You may contact Amy @ ###-#### or Ada County Highway Dist. if need to Don @ ###-#### called need scope of work r/i request, and electricians phone number
|