GCE-Final | 7/28/2010 | 7/29/2010 | 7/29/2010 | A | PASS |
Doug A Poedy
|
|
|
Scope: Final Contact: Pat @ ###-####
|
GCE-Final | 6/16/2010 | 6/17/2010 | 6/17/2010 | A | CANC |
Bob Reichert
|
|
|
Scope of Inspection: Final (Heated Tile Floor)Contact: Pat @ ###-#### wrong type request, see ri
|
GCE-Rough-In | 6/17/2010 | 6/17/2010 | 6/17/2010 | A | PASS |
Bob Reichert
|
|
|
Scope of Inspection: Final (Heated Tile Floor)Contact: Pat @ ###-#### ok to cover floor heat only
|
GCE-Permanent Service | 5/11/2010 | 5/12/2010 | 5/12/2010 | A | PASS |
Doug A Poedy
|
|
|
Scope of inspection: Permanent ServiceContact: Pat @ ###-####CUSTOMER HAS REQUESTED A.M. INSPECTION PLEASE. P/S U/G Reconnect ok.
|
GCE-Rough-In | 5/10/2010 | 5/11/2010 | 5/11/2010 | A | PASS |
Doug A Poedy
|
|
|
Scope of inspection: Rough -inContact: Pat @ ###-#### ric ok
|