GCE-Final | 2/24/2011 | 2/25/2011 | 2/25/2011 | A | PASS |
Jack Frank
|
|
|
FinalJack @ ###-####Call in advance please - PM Inspection was finaled 02 25-11
|
GCE-Final | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | PASS |
Daryl DeGrange
|
|
|
FinalJack @ ###-####Call in advance for access final ok
|
GCE-Permanent Service | 2/16/2011 | 2/17/2011 | 2/17/2011 | A | PASS |
Bob Reichert
|
|
|
Perm Service (Service Change)jack @ ###-####Call in advance for access at final, check strapping at panel, abrasion protection for grounds, water pipe ground, ground rods at shed, bond screw in service panel, p/s u/g rec ok
|
GCE-Permanent Service | 2/15/2011 | 2/16/2011 | 2/16/2011 | A | NR |
Daryl DeGrange
|
|
|
Perm ServiceJack @ ###-####Call in advance contractor not ready
|
GCE-Rough-In | 2/15/2011 | 2/15/2011 | 2/15/2011 | P | CANC |
Daryl DeGrange
|
|
|
call for access jack ###-####
|
GCE-Rough-In | 2/14/2011 | 2/15/2011 | 2/15/2011 | A | NR |
Jack Frank
|
|
|
Rough-InJack @ ###-####Call for access see pm request
|