GCE-Final | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | PASS |
Daryl DeGrange
|
|
|
FinalPat @ ###-#### final ok
|
GCE-Final | 3/2/2011 | 3/3/2011 | 3/3/2011 | A | NR |
Daryl DeGrange
|
|
|
Finalpat @ ###-#### main breakers need 22,000 fault current rating
|
GCE-Permanent Service | 3/2/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Daryl DeGrange
|
|
|
Perm Servicepat @ ###-#### p/s u/g rec ok
|
GCE-Permanent Service | 2/24/2011 | 2/25/2011 | 2/25/2011 | A | FAIL |
Jack Frank
|
|
|
Perm ServicePat @ ###-####Call in advance shall provide required grding and bonding at new p/s , and address both subpanels
|