GCE-Temporary Service | 5/16/2011 | 5/17/2011 | 5/17/2011 | A | PASS |
Doug A Poedy
|
|
|
Temp Service (Construction Trailer)Hank @ ###-####Call in advance. Warned that breaker size probably wouldn't hold.
|
GCE-Temporary Service | 5/13/2011 | 5/16/2011 | 5/16/2011 | A | NR |
Daryl DeGrange
|
|
|
Temp Service (Construction Trailer)Hank @ ###-####Call in advance
|
GCE-Courtesy | 5/11/2011 | 5/12/2011 | 5/12/2011 | A | DONE |
Daryl DeGrange
|
|
|
Preliminary ConferenceHank @ ###-####Call in advance discussed with hank-electrican service explansion for new addition, grounding. job trailor temp. power. electrical permit required on job trailor temp. power
|