GCE-Final | 6/9/2011 | 6/10/2011 | 6/10/2011 | A | PASS |
Daryl DeGrange
|
|
|
FinalZane @ ###-####Call in advance final ok
|
GCE-Permanent Service | 6/9/2011 | 6/10/2011 | 6/10/2011 | A | PASS |
Daryl DeGrange
|
|
|
Perm ServiceZane @ ###-####Call in advance p/s u/g meter pack ok
|
GCE-Rough-In | 6/6/2011 | 6/7/2011 | 6/7/2011 | A | PASS |
Daryl DeGrange
|
|
|
Rough-In (Groundwork)Zane @ ###-####Call in advance rough-in ok cover trench
|
GCE-Final | 5/25/2011 | 5/26/2011 | 5/26/2011 | A | PASS |
Daryl DeGrange
|
|
|
FinalZane @ ###-####Call in advance final ok
|
GCE-Permanent Service | 5/25/2011 | 5/25/2011 | 5/25/2011 | A | PASS |
Daryl DeGrange
|
|
|
zane ###-#### p/s u/g rec ok meter pac
|