GCE-Final | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Daryl DeGrange
|
|
|
(Mandatory Inspection) final ok
|
GCE-Final | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Daryl DeGrange
|
|
|
(Mandatory Inspection) final ok
|
GCE-Rough-In | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | PASS |
Doug A Poedy
|
|
|
Rough-InMike @ ###-####Call in advance. Ok to cover.
|
GCE-Rough-In | 8/16/2011 | 8/17/2011 | 8/17/2011 | A | FAIL |
Doug A Poedy
|
|
|
Rough-InMike @ ###-####Call for access. Staples too close to edges. Make ups not done. Needs 20 amp circuit to upstairs bathroom. Need to fix existing bathroom light box.
|