GCE-Rough-In Permanent Service | 10/10/2011 | 10/11/2011 | 10/11/2011 | A | PASS |
Daryl DeGrange
|
|
|
Dean or Mike @ ###-#### or ###-####Timing of Inspection Very Important. This is a Garden City Well House. Please call the contractor to coordinate.p/s u/g rec ok
|
GCE-Rough-In | 9/7/2011 | 9/8/2011 | 9/8/2011 | A | PASS |
Daryl DeGrange
|
|
|
Mike @ ###-####Call in advanceAM Inspection - Pouring Concrete at 9 a.m.rough-in ok cover pour concrete
|