GCE-Final | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | PASS |
Daryl DeGrange
|
|
|
Matt @ ###-#### final ok
|
GCE-Rough-In | 1/24/2012 | 1/25/2012 | 1/25/2012 | A | PASS |
Daryl DeGrange
|
|
|
Matt @ ###-####Call for directions rough-in p/s ok Listed solar powered luminaire
|
GCE-Rough-In | 1/17/2012 | 1/18/2012 | 1/18/2012 | A | PASS |
Daryl DeGrange
|
|
|
Shawn @ ###-####Call for directions rough-in ok cover underground northside,green belt path
|
GCE-Rough-In Permanent Service | 12/29/2011 | 12/30/2011 | 12/30/2011 | A | PART |
Doug A Poedy
|
|
|
Matt @ ###-####Call in advance. Underground next to small block building ok to cover.
|
GCE-Rough-In | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | FAIL |
Bob Reichert
|
|
|
Matt @ ###-####call for access/info covered 2" with rock along wall for low voltage, under dam ok, will recall
|
GCE-Rough-In | 12/5/2011 | 12/6/2011 | 12/6/2011 | A | PASS |
Daryl DeGrange
|
|
|
Matt @ ###-#### rough-in ok pour vertical walls of center section
|
GCE-Rough-In | 12/2/2011 | 12/5/2011 | 12/5/2011 | A | NR |
Doug A Poedy
|
|
|
Matt @ ###-####Located at end of 35th St. toward Boise RiverCall in advance. Conduits removed by construction people.
|
GCE-Rough-In | 11/21/2011 | 11/22/2011 | 11/22/2011 | A | PASS |
Daryl DeGrange
|
|
|
Matt @ ###-####Call in advanceRay Neef Whitwater Park rough-in ok cover under ground west half of diverion dam
|