GCE-Final | 9/11/2012 | 9/13/2012 | 9/13/2012 | A | PASS |
Daryl DeGrange
|
|
|
Matthew @ ###-#### AM Inspection Requested. Witness field label evaluator Lanny McBride final ok
|
GCE-Final | 8/30/2012 | 8/30/2012 | 8/31/2012 | P | NR |
Daryl DeGrange
|
|
|
Mathew @ ###-#### waiting for approval from Intertrek
|
GCE-Final | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | NR |
Daryl DeGrange
|
|
|
|
GCE-Rough-In | 8/10/2012 | 8/10/2012 | 8/10/2012 | P | FAIL |
Daryl DeGrange
|
|
|
Matt @ ###-#### AFternoon inspection requested for today. Corrections still exsist UL's White book page 305 photovltaic modules and panels (UL mark)
|
GCE-Rough-In | 8/9/2012 | 8/10/2012 | 8/10/2012 | A | FAIL |
Daryl DeGrange
|
|
|
Matt @ ###-#### Call in advance Solar Photovoltaic system, NEC 110.3(B) Equipment not listed with nationally recongnized testing lab
|