GCE-Final | 1/7/2014 | 1/7/2014 | 1/7/2014 | P | PASS |
Rock A. Hudson
|
|
|
(Mandatory Inspection)Paul ###-#### call for access Final ok
|
GCE-Final | 12/31/2013 | 1/3/2014 | 1/3/2014 | A | FAIL |
Rock A. Hudson
|
|
|
Paul ###-#### call first 3 receptical outlets east wall dead. Will recall
|
GCE-Rough-In | 9/6/2013 | 9/6/2013 | 9/6/2013 | P | PASS |
Rock A. Hudson
|
|
|
Paul ###-#### Ceiling and bathroom rough in ok cover
|
GCE-Rough-In | 9/3/2013 | 9/4/2013 | 9/4/2013 | A | NH |
Rock A. Hudson
|
|
|
Paul ###-#### Changes to electrical were made, lights moved Bldg locked. Called contractor no return phone call
|
GCE-Rough-In | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PASS |
Rock A. Hudson
|
|
|
###-#### call in advance Lighting in mid area rough in ok cover
|