GCE-Final | 8/8/2013 | 8/9/2013 | 8/9/2013 | A | PASS |
Rock A. Hudson
|
|
|
Shane ###-#### swimming pool final, gate at either side open Final ok
|
GCE-Final | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | CANC |
Rock A. Hudson
|
|
|
Shawn ###-#### Needed rough in inspection
|
GCE-Rough-In | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | PASS |
Rock A. Hudson
|
|
|
Shawn ###-#### potting rough in ok cover
|
GCE-Final | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | CANC |
Rock A. Hudson
|
|
|
Charles ###-#### Needed rough in inspection
|
GCE-Rough-In | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | PASS |
Rock A. Hudson
|
|
|
Charles ###-#### Pool cover bonds rough in cover
|
GCE-Rough-In | 7/11/2013 | 7/11/2013 | 7/11/2013 | P | PASS |
Daryl DeGrange
|
|
|
###-#### Pool pump rough-in ok cover pool underground and bonding
|