GCE-Final | 10/3/2013 | 10/3/2013 | 10/3/2013 | P | PASS |
Rock A. Hudson
|
|
|
Daniel ###-#### Final ok
|
GCE-Final | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Daniel ###-#### call first Utility GFCI receptical will not reset
|
GCE-Rough-In Permanent Service | 7/24/2013 | 7/19/2013 | 7/24/2013 | P | CANC |
Rock A. Hudson
|
|
|
###-####
|
GCE-Rough-In Permanent Service | 7/24/2013 | 7/23/2013 | 7/24/2013 | P | CANC |
Rock A. Hudson
|
|
|
Daniel ###-####
|
GCE-Rough-In Permanent Service | 7/23/2013 | 7/23/2013 | 7/23/2013 | A | PASS |
Rock A. Hudson
|
|
|
Daniel ###-#### Rough in ok cover p/s u/g n ok
|
GCE-Rough-In Permanent Service | 7/19/2013 | 7/19/2013 | 7/22/2013 | P | FAIL |
Rock A. Hudson
|
|
|
###-#### BCC 4-05-31 (C)- All unfused conductors shall be installed in a rigidmetal or IMC or sch.80 PVC. If Mettallic raceway is used a bonding bushing shall be used if receway enters through concentric knock-outs as per 250.92
|