GCE-Final | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Daryl DeGrange
|
|
|
Brad ###-#### final ok
|
GCE-Permanent Service | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | PASS |
Daryl DeGrange
|
|
|
p/s u/g n ok
|
GCE-Rough-In | 5/12/2014 | 5/13/2014 | 5/13/2014 | A | PART |
Daryl DeGrange
|
|
|
Brad ###-#### Partial rough-in cover for bump-out walls in front office, North and northeast exterior walls
|
GCE-Rough-In Permanent Service | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | PART |
Daryl DeGrange
|
|
|
(Mandatory Inspection) Would like a Rough-in to cover and a permanent service inspection. Walls in office area already onesided, Rough-in ok cover remainder of office area only. No riser room cover
|
GCE-Rough-In | 3/26/2014 | 3/26/2014 | 3/26/2014 | P | PASS |
Rex Boyles
|
|
|
rough in u/g ID. Power secondary 3 ' conduit ok to cover
|
GCE-Rough-In | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PASS |
Rock A. Hudson
|
|
|
Brad ###-#### Underground interior rough in ok cover
|