GCE-Final | 6/9/2014 | 6/10/2014 | 6/10/2014 | A | PASS |
Rex Boyles
|
|
|
Ryan ###-#### call for location of key final ok
|
GCE-Rough-In | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Bob Reichert
|
|
|
Ryan ###-#### ri ok
|
GCE-Rough-In | 4/10/2014 | 4/14/2014 | 4/14/2014 | A | DONE |
Rex Boyles
|
|
|
Ryan ###-#### please call to meet on site- preliminary conference to discuss project meet with ryan to discuss proper installation in dog kennel area to be washed down to clean.
|