GCE-Final | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Rex Boyles
|
|
|
Daniel ###-#### corrections made final ok
|
GCE-Final | 10/23/2014 | 10/23/2014 | 10/23/2014 | P | FAIL |
Rock A. Hudson
|
|
|
Daniel 409-269 house open 406.4 Receptacle cover shall be flush with receptacle
314.23.B.1 Nails and screws where used as a fastening, shall be attached by using brackets on the outside of the enclosure
|
GCE-Final | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | NH |
Rock A. Hudson
|
|
|
(Mandatory Inspection) No access just sealed concrete in garage and back patio
|
GCE-Permanent Service | 8/21/2014 | 8/22/2014 | 8/22/2014 | A | PASS |
Daryl DeGrange
|
|
|
daniel ###-#### p/s u/g n ok
|
GCE-Rough-In Permanent Service | 8/13/2014 | 8/13/2014 | 8/13/2014 | P | DONE |
Daryl DeGrange
|
|
|
see final
|
GCE-Rough-In Permanent Service | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | FAIL |
Rock A. Hudson
|
|
|
Daniel ###-#### 250.8(A)(1)- grounded electrical system connection to grounding electrode system loose on both ground rods. 300.4- NM cable shall be protectedfrom physical damage when ran through bored holes that do not maintain 1 1/4" from framing surface
|