GCE-Final | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Rex Boyles
|
|
|
Jesse ###-#### - requested call ahead final on solar ok
|
GCE-Rough-In | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | PASS |
Rex Boyles
|
|
|
Jesse Simpson ###-#### look at invertor space for clearances to loadcenters. ok betwween if kept up in elevation.
|
GCE-Rough-In Permanent Service | 9/22/2014 | 9/22/2014 | 9/22/2014 | P | CANC |
Rex Boyles
|
|
|
(Mandatory Inspection) needed r/i only
|
GCE-Rough-In | 9/22/2014 | 9/22/2014 | 9/22/2014 | P | PASS |
Rex Boyles
|
|
|
(Mandatory Inspection) r/i ok solar conduit to roof and ground and 6-3 romex
|