GCE-Final | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Eric Story
|
|
|
Steve ###-#### final ok
|
GCE-Final | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | NR |
Eric Story
|
|
|
Steve ###-#### not ready
|
GCE-Final | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | NR |
Rock A. Hudson
|
|
|
Steve ###-#### Contractor to install AC unit and light fixtures at man doors. Owner asked me not to do inspection due to incomplete.
|
GCE-Rough-In | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | PASS |
Rock A. Hudson
|
|
|
Steve ###-#### rough-in and cover Back south addition rough in ok cover.
|
GCE-Rough-In | 10/3/2014 | 10/6/2014 | 10/6/2014 | A | FAIL |
Rex Boyles
|
|
|
Steve ###-#### get nm cable out of pinch points in trusses.. WATCH FOR DOG . I GOT ATTACKED AND BIT
|