GCE-Permanent Service | 11/27/2014 | 12/1/2014 | 12/1/2014 | A | CANC |
Rex Boyles
|
|
|
Duane ###-#### needed p/s and final
|
GCE-Final | 12/1/2014 | 12/1/2014 | 12/1/2014 | A | PASS |
Rex Boyles
|
|
|
Duane ###-#### final ok Duane confirms grounding electrode is ok
|
GCE-Permanent Service | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PASS |
Rex Boyles
|
|
|
Duane ###-#### p/s u/g rec ok pedestal
|
GCE-Permanent Service | 11/24/2014 | 11/25/2014 | 11/25/2014 | A | FAIL |
Rex Boyles
|
|
|
Duane ###-#### 110.26(A)(1) 36" working space required for 0-150 volt . 230.70 Main disconnect shall be readily accessable.
|