GCE-Final | 5/13/2015 | 5/14/2015 | 5/14/2015 | A | PASS |
Rex Boyles
|
|
|
Jackie ###-#### final ok
|
GCE-Permanent Service | 3/25/2015 | 3/26/2015 | 3/26/2015 | A | PASS |
Rex Boyles
|
|
|
Wade ###-#### p/s u/g n ok
|
GCE-Rough-In | 3/23/2015 | 3/24/2015 | 3/24/2015 | P | PASS |
Rex Boyles
|
|
|
Wade ###-#### - ceiling inspection request r/i ceilings ok (Will look for this at final inspection -Identify seismic wires to troffers 410.36 and 300.11(A)(2)
|
GCE-Rough-In | 3/4/2015 | 3/5/2015 | 3/5/2015 | A | PASS |
Bob Reichert
|
|
|
Wade ###-#### - rough-in soffit ok cover soffit
|
GCE-Rough-In | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Rex Boyles
|
|
|
Wade ###-#### - partial rough-in walls r/i walls ok
|
GCE-Rough-In | 1/20/2015 | 1/21/2015 | 1/21/2015 | P | PASS |
Rex Boyles
|
|
|
Hudson ###-#### light pole bases and underground ok to cover r/i ok
|
GCE-Rough-In | 12/22/2014 | 12/22/2014 | 12/22/2014 | P | PASS |
Rex Boyles
|
|
|
Wade ###-#### r/i slab ok to pour
|
GCE-Rough-In | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | PASS |
Rex Boyles
|
|
|
Hudson ###-#### u.ground telco conduits ok
|
GCE-Rough-In | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Rex Boyles
|
|
|
Bryan ###-#### - requested call ahead Called Bryan and he said UFER inspection never requested from garden city yesterday. Concrete already poured. They have picture for us of ufer. Also info incorrect on permit. He's calling garden city to correct this.
|