GCE-Final | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Daryl DeGrange
|
|
|
Kevin ###-#### correction done, final ok
|
GCE-Final | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | FAIL |
Eric Story
|
|
|
Kevin ###-#### - 3rd floor NEC corrections still pending
|
GCE-Final | 10/29/2015 | 10/30/2015 | 10/30/2015 | P | FAIL |
Eric Story
|
|
|
Kevin ###-#### 334.15 exposed nm cable subject to physical damage in furnace areas running from 2nd floor threw the 3rd floor to the heat pumps on roof
|
GCE-Final | 10/28/2015 | 10/29/2015 | 10/29/2015 | A | PART |
Rex Boyles
|
|
|
Kevin ###-#### - 2nd floor 10 units 201 thru 211 final ok, corrections made for 101 thru 111, final ok on these rooms also
|
GCE-Final | 10/28/2015 | 10/28/2015 | 10/28/2015 | A | CANC |
Rex Boyles
|
|
|
Kevin ###-#### already inspected
|
GCE-Final | 10/28/2015 | 10/28/2015 | 10/28/2015 | A | FAIL |
Rex Boyles
|
|
|
Kevin ###-####-1st floor-10 units 210.8 (A)(7)- Gfci protection required within 6' of sinks
|
GCE-Rough-In | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - ceiling grid insp. 2nd - 3rd floors r/i ok 2nd and 3rd flr t bar ceilings
|
GCE-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PART |
Eric Story
|
|
|
Kevin ###-#### - midwing units appliances were already set (verified cord hook up on 1st floor unit 112 that cord on range was correct) 1st floor units 314/315/313 2nd floor unitss 216/215/217 1st floor units 114/113/112/110 partial ok
|
GCE-Final | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | PART |
Rex Boyles
|
|
|
Kevin ###-#### final ok temp. occupancy ok in common areas, elevator equip. rm, clubhouse, kitchen and corridors on 1st thru 3rd floors. Will look for lockoffs on all furnaces in east wing rooms and water heater hook up in fire alarm room on next inspection
|
GCE-Rough-In | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - 1st floor ceiling grid r/i ceiling ok
|
GCE-Permanent Service | 9/17/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - perm. service final on street lighting p/s u/g n ok street light pedestal
|
GCE-Permanent Service | 9/17/2015 | 9/17/2015 | 9/17/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - service insp. for structure p/s u/g n ok (this p/s request is for meters for units) located in service no. 1 so. west corner of complex
|
GCE-Final | 9/17/2015 | 9/17/2015 | 9/17/2015 | P | CANC |
Rex Boyles
|
|
|
Kevin ###-#### - streetlight final needs public works inspection for light poles..(Needs p/s insp. for power to pedestal from city of boise for meter)
|
GCE-Rough-In | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | CANC |
Eric Story
|
|
|
Kevin ###-#### - street lights needed final
|
GCE-Rough-In | 9/2/2015 | 9/2/2015 | 9/2/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - 2nd & 3rd floor and rooftop r/i ok 2nd and 3rd floor corridors east wing. Final ok rooftop mechanical electrical ok 500 mcm cu ok to 1600amp meter section
|
GCE-Rough-In | 9/1/2015 | 9/1/2015 | 9/1/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - unit #101 and ceiling at 1st floor E. wing r/i ok rm. 101 and ok to cover ceiling in east wing 1st flr hall
|
GCE-Rough-In | 8/28/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Rock A. Hudson
|
|
|
Kevin ###-#### Temp final on rooms 218 thru 223 and 316 thru 321
|
GCE-Final | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PART |
Daryl DeGrange
|
|
|
Kevin ###-#### Partial final for units 115,116,117,118,119,120. Temp. occupancy only if Fire Dept. oks
|
GCE-Rough-In | 8/13/2015 | 8/13/2015 | 8/13/2015 | P | CANC |
Eric Story
|
|
|
Kevin ###-#### needed conference
|
GCE-Rough-In | 8/10/2015 | 8/10/2015 | 8/10/2015 | P | PASS |
Eric Story
|
|
|
Kevin ###-#### fire riser room ok cover
|
GCE-Rough-In | 8/7/2015 | 8/7/2015 | 8/7/2015 | P | PASS |
Eric Story
|
|
|
Kevin ###-#### 3rd floor rooms 302,305,304,307,306,309,308,311 ok cover
|
GCE-Rough-In | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### r/i ok rms. 201 thru 209 and 211
|
GCE-Rough-In | 7/20/2015 | 7/20/2015 | 7/20/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### r/i ok rms 102 thru109, and 111 and stairwell #176
|
GCE-Rough-In | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | PART |
Bob Reichert
|
|
|
Kevin ###-#### common area, 1st floor walls, ceiling ok cover
|
GCE-Rough-In | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | PASS |
Eric Story
|
|
|
Kevin ###-#### 2nd and 3rd floor corridors cielings ok cover
|
GCE-Rough-In | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | PASS |
Rex Boyles
|
|
|
Kevin ###-#### r/i ok rms. 210, 212 thru 216, 310, 312 thru 317
|
GCE-Permanent Service | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - service insp. p/s u/g n ok
|
GCE-Rough-In | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### r/i ok rms. 110,112,113 and 116. Also r/i ok east stairwell and east maint. rm.
|
GCE-Rough-In | 5/8/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### r/i ok east wing 3rd flr rooms ok
|
GCE-Rough-In | 5/6/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - underground insp. r/i ok service 1 of 2 meter bank feeds from 1200 amp section
|
GCE-Permanent Service | 5/6/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - start service insp. p/s u/g n ok service 2 of 2 (north east corner)
|
GCE-Rough-In | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### r/i ok rms. only 218 thru 223
|
GCE-Rough-In | 4/27/2015 | 4/28/2015 | 4/28/2015 | P | CANC |
Rex Boyles
|
|
|
Kevin ###-#### called in twice
|
GCE-Rough-In | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | PASS |
Rex Boyles
|
|
|
Kevin ###-#### beginning of r/i of rooms r/i ok north east dnst. rms. ok see e-sheets
|
GCE-Rough-In | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin Burke ###-#### inspection request for light pole bases u.ground raceways to poles ok and pole bases ok to pour
|
GCE-Rough-In | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | PASS |
Bob Reichert
|
|
|
Kevin ###-#### - underground insp. u/g ok for west parking lot lights
|
GCE-Rough-In | 3/2/2015 | 3/3/2015 | 3/3/2015 | A | PASS |
Cevyn Recla
|
|
|
Kevin ###-#### - underground conduit runs to parking lot lighting, ok to cover
|
GCE-Rough-In | 2/26/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Rex Boyles
|
|
|
Kevin ###-#### - underground insp. r/i u.ground to light poles east side of parking lot ok. Still need to see pole bases before pouring.
|
GCE-Rough-In | 1/28/2015 | 1/28/2015 | 1/28/2015 | P | DONE |
Daryl DeGrange
|
|
|
Kevin ###-#### - INSPECTION IS FOR A CONFERENCE. Inspection request name "preliminary conference" is not a valid inspection and is not received by PDS Online. Discuss with electrical contractor NEC requirements for service feeders and switches installed in damp locations.
|
GCE-Temporary Service | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | PASS |
Cevyn Recla
|
|
|
Kevin ###-#### - temp pole insp. temp pole that sits in front of Id Pow transformer #TW-14 TS, UG, N, OK
|
GCE-Rough-In | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | PASS |
Rock A. Hudson
|
|
|
Kevin ###-#### - underground raceways North electrical room underground rough in ok cover
|
GCE-Rough-In | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PASS |
Rex Boyles
|
|
|
Kevin ###-#### -underground raceways completion of 2-21/2" feeders r/i ok
|
GCE-Rough-In | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PASS |
Cevyn Recla
|
|
|
Kevin ###-#### - groundwork insp. Underground, continuation of 2-2 1/2" conduits, running from riser room toward gear
|
GCE-Rough-In | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PART |
Rex Boyles
|
|
|
Kevin ###-#### - underground insp. elevator feed, house panel feed and telco and UFER r/i ok to cover(see plans for exact location)
|