GCE-Final | 2/5/2015 | 2/9/2015 | 2/9/2015 | A | PASS |
Cevyn Recla
|
|
|
Clay ###-#### - requested call ahead Final OK
|
GCE-Rough-In | 1/13/2015 | 1/14/2015 | 1/13/2015 | A | PASS |
Rex Boyles
|
|
|
Calvin ###-#### r/i ramp heat sysytem ok to cover
|
GCE-Rough-In | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | PASS |
Rex Boyles
|
|
|
Calvin ###-#### r/i ok U Haul ramp sump pump and ramp snowmelt conduits up to ramp ok
|