GCE-Final | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Rex Boyles
|
|
|
###-#### final ok
|
GCE-Permanent Service | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Rex Boyles
|
|
|
###-#### permanent service corrections made p/s o/h rec ok
|
GCE-Rough-In | 2/11/2015 | 2/12/2015 | 2/12/2015 | P | CANC |
Rex Boyles
|
|
|
Same Day Elec. ###-#### needed p/s 250.53(2) supplemental grounding electrode required. 250.94-Intersystem bonding ground bar required. Will look for this at p/s request and final
|