GCE-Final | 11/9/2015 | 11/10/2015 | 11/10/2015 | A | PASS |
Rex Boyles
|
|
|
Marcie ###-#### corrections made final ok
|
GCE-Final | 11/3/2015 | 11/4/2015 | 11/4/2015 | P | FAIL |
Eric Story
|
|
|
Marcie ###-#### - call ahead 314.25 blank covers required for j-boxes
|
GCE-Final | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | CANC |
Rex Boyles
|
|
|
Todd ###-#### needed conference for now
|
GCE-Courtesy | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | DONE |
Rex Boyles
|
|
|
Todd ###-#### conference to discuss clean up of electrical system for new tenant. Asked electrical contractor to add grounding electrode and install new #6 to confirm earth ground. confirm building steel ground and water piping system to ground. Confirm separatly derived system grounded. Relocate existing loadcenter mounted at 7 or 8 foot down to meet height requirments. Strap conduits throughout building, install KO seal in unused openings, remove damaged conduits and boxes or repair where needed, install j boxes with covers on unused raceways, repair or replace damaged outlets and switches. May need to install exit signs and emergency egress lighting. Check with building inspector.
|