Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberGCE15-00112
StatusFinaled
Name Energy Enterprise Group
Site Address 240 E 32ND
Project NameELE2015-00112
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCE-Final1/26/20161/26/20161/26/2016PPASS
DetailsRex Boyles
Bob ###-#### corrections made final ok perm. occ. ok
GCE-Final1/25/20161/26/20161/26/2016AFAIL
DetailsRex Boyles
Bob ###-#### 210.8(B)(5)-GFCI protection required for receptacles within 6 foot of sinks, Correct fuses for rooftop condensing units, blank plates needed.
GCE-Final1/13/20161/14/20161/14/2016APART
DetailsRex Boyles
Bob ###-#### - final for temp. occupancy of main floor partial final ok for 1st floor in highlighted area on plans. Temporary Occupancy ok for 1st floor
GCE-Rough-In1/12/20161/12/20161/12/2016PPASS
DetailsRex Boyles
Bob ###-#### - partial rough-in r/i t grid ceiings 1st and 2nd floors ok
GCE-Rough-In1/6/20161/7/20161/7/2016APASS
DetailsEric Story
Bob ###-#### - partial rough-in back wall outlets ok cover
GCE-Rough-In1/5/20161/6/20161/6/2016APASS
DetailsEric Story
Bob ###-#### - partial rough-in upstairs hall hard lid ok cover
GCE-Rough-In12/29/201512/29/201512/29/2015PPASS
DetailsRex Boyles
Bob ###-#### all hard lid ceilings 1st floor ok to cover
GCE-Rough-In12/18/201512/18/201512/18/2015PPASS
DetailsRex Boyles
Bob ###-#### - partial rough-in r/i ok wine tasting room walls and switch at bottom of stairs in same area
GCE-Rough-In12/15/201512/15/201512/15/2015PPASS
DetailsRex Boyles
Bob ###-#### - partial rough-in r/i ok walls in lab. ,bathroom and rear pocket door wall inside and outside. Not necessary to seal penetrations in 50 degree storage rooms. No condensation issues that I can see
GCE-Rough-In12/14/201512/14/201512/14/2015PPASS
DetailsRex Boyles
Bob ###-#### - partial rough-in r/i lab walls ok
GCE-Permanent Service12/13/201512/14/201512/14/2015APASS
DetailsRex Boyles
Bob ###-#### correction made p/s u/g n ok
GCE-Permanent Service12/9/201512/10/201512/10/2015AFAIL
DetailsBob Reichert
Bob ###-#### met contractor, told to use other method wiring out of floor
GCE-Permanent Service12/9/201512/9/201512/9/2015PFAIL
DetailsRex Boyles
Bob ###-#### still need fire sprinkeler riser bonded and available fault current info label
GCE-Rough-In12/9/201512/9/201512/9/2015PPASS
DetailsRex Boyles
Bob ###-#### r/i walls ok upst. offices and corridor see sheet A2.1 pink highlighted areas
GCE-Rough-In12/1/201512/1/201512/1/2015PPASS
DetailsRex Boyles
Bob ###-#### r/i ok walls highlighted in pink on sheet A2.1
GCE-Rough-In11/24/201511/25/201511/25/2015PPASS
DetailsEric Story
Bob ###-#### exterior and interior walls as per contractors print ok cover
GCE-Rough-In9/22/20159/22/20159/22/2015PPASS
DetailsBob Reichert
Bob ###-#### - partial rough-in ok cover u/g north slab
GCE-Rough-In9/21/20159/21/20159/21/2015PPASS
DetailsRex Boyles
Bob ###-#### r/i ok under slab conduits south lower slab
GCE-Rough-In8/7/20158/7/20158/7/2015PPASS
DetailsEric Story
Bob ###-#### ufer ok cover
GCE-Rough-In7/16/20157/16/20157/16/2015PPART
DetailsBob Reichert
Bob ###-#### looked at u/g from xfmr to building foundation, told general we don't usually look at serving utility raceways, 2 90's installed, will see rest later