GCE-Final | 9/3/2015 | 9/4/2015 | 9/4/2015 | A | PASS |
Rex Boyles
|
|
|
Asher ###-#### corrections made final ok
|
GCE-Final | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | PART |
Rex Boyles
|
|
|
Asher ###-#### perm. occupancy ok still need available fault current label and arc flash labels on disconnect and loadcenter
|
GCE-Permanent Service | 8/24/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Eric Story
|
|
|
Asher ###-#### p/s u/g rec ok
|
GCE-Rough-In | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Rex Boyles
|
|
|
Joel ###-#### - underground insp. r/i u. ground conduits ok
|