GCE-Final | 1/20/2017 | 1/23/2017 | 1/23/2017 | A | PASS |
Tom Saunders
|
|
|
Bob ###-####-please call 20 minutes prior to meet for access...
job complete...ok to final
|
GCE-Final | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PART |
Mark Moncarr
|
|
|
Bob ###-#### - INSP. FOR TEMP OCC. ONLY Temp OCC ok. Next inspect will check Lt in O2 room, freezer, cabinet in ICU, CT rm, Xray machine, 2 pass throughs, and cabinet in rm 158. Everything is safed off.
|
GCE-Rough-In | 11/14/2016 | 11/15/2016 | 11/14/2016 | A | PASS |
Mark Moncarr
|
|
|
Bob ###-#### - partial rough- in for checkout counter inspected wall when I did the partial final on 11/14/16
|
GCE-Final | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PART |
Mark Moncarr
|
|
|
Bob ###-#### - PARTIAL FINAL - rooftop and 2nd floor Rooftop and 2nd floor ok partial except Apartment, Ferno pool, Powerex O2 vac, and GFI next to Ferno.
|
GCE-Rough-In | 11/9/2016 | 11/10/2016 | 11/10/2016 | A | PASS |
Mark Moncarr
|
|
|
Bob ###-#### - receptionist desk and rooftop area Rough in cover reception desk only. Contractor called in Partial final for rooftop units.
|
GCE-Rough-In | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | PASS |
Mark Moncarr
|
|
|
Bob ###-#### - partial rough-in Ceiling cover for Apartment
|
GCE-Rough-In | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Tom Saunders
|
|
|
Bob ###-#### - partial rough-in...ok to cover cans and photocell wiring in porte-cochere/entry
|
GCE-Rough-In | 10/16/2016 | 10/14/2016 | 10/17/2016 | A | PASS |
James Ady
|
|
|
Bob ###-#### - cover and UG Underground and 1st floor Ceiling ok to cover
|
GCE-Rough-In | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Rock A. Hudson
|
|
|
Bob ###-#### Check labelling of HVAC transformer disconnects for damper transformers. 2nd floor appartments walls and hardlids and 1st floor grid marked in green on contractor print rough in ok cover
|
GCE-Rough-In | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | PASS |
James Ady
|
|
|
Bob ###-#### Front entry hard lid, Under stair hardlid, west storage hard lid and 2nd floor mechanical room hard lid ok to cover
|
GCE-Rough-In | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PASS |
James Ady
|
|
|
Bob ###-#### conduit for 2 light poles and sign ok to cover. Pole bases ok
|
GCE-Rough-In | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Tom Saunders
|
|
|
Bob ###-####
ok wall cover...areas as marked on plans generator grounding ok
|
GCE-Rough-In | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | PASS |
Mark Moncarr
|
|
|
Bob ###-#### ceilings for 5 operating rooms. Lab restroom ceiling 2nd floor. Conference room ceiling 2nd floor. ok cover
|
GCE-Rough-In | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PASS |
Eric Story
|
|
|
Bob ###-#### - ceiling insp. 2nd floor ceilings as noted on print ok cvoer
|
GCE-Rough-In | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PART |
James Ady
|
|
|
Bob ###-#### - hardlid insp. Ceiling OK as marked on print Talked about accessability through 2x2 lay ins in opperating rooms.
|
GCE-Rough-In | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | PASS |
James Ady
|
|
|
Bob ###-#### As marked on print ok to cover
|
GCE-Rough-In | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PASS |
James Ady
|
|
|
Bob ###-#### - partial rough in Front columns and half wall
|
GCE-Permanent Service | 8/18/2016 | 8/18/2016 | 8/18/2016 | P | PASS |
James Ady
|
|
|
Bob ###-#### - p/s u/g n ok
|
GCE-Rough-In | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
James Ady
|
|
|
Bob ###-#### rough in ok as marked on contractor print
|
GCE-Rough-In | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PASS |
James Ady
|
|
|
Bob ###-#### - partial rough-in Walls only as marked on Contracter print
|
GCE-Rough-In | 8/4/2016 | 8/4/2016 | 8/5/2016 | P | DONE |
James Ady
|
|
|
CONSULTATION ONLY - Brad ###-#### - please call 30min ahead Talked about Parralel feeders from the generator. And need to derate conductors
|
GCE-Rough-In | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | PASS |
James Ady
|
|
|
Bob ###-#### - partial rough-in Raised concrete Platform 2nd floor. Panel wall 2nd floor ok to cover
|
GCE-Rough-In | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PART |
James Ady
|
|
|
Bob ###-#### - partial rough in OK to cover as marked on contractor print
|
GCE-Rough-In | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | PASS |
James Ady
|
|
|
Kip ###-#### - partial rough in Ok to cover as marked on electrical lighting plan.
|
GCE-Rough-In | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
James Ady
|
|
|
Bob ###-#### Rough in ok to cover Areas marked on EEG print
|
GCE-Rough-In | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Eric Story
|
|
|
Bob ###-#### - partial rough-in exterior walls as noted on EC prints
|
GCE-Rough-In | 7/1/2016 | 7/5/2016 | 7/5/2016 | A | PASS |
Eric Story
|
|
|
Bob ###-#### - partial rough in west and north exterior walls only ok cover
|
GCE-Rough-In | 6/29/2016 | 6/29/2016 | 6/29/2016 | P | PASS |
Eric Story
|
|
|
Bob ###-#### upper parapet walls only ok cover(j-boxes for x-mas receptacles will be in upper floor cielings)
|
GCE-Rough-In | 6/3/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Daryl DeGrange
|
|
|
Bob ###-#### rough-in ok cover service feeders / generator underground
|
GCE-Rough-In | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Rex Boyles
|
|
|
Bob ###-#### - underground insp. r/i underslab conduits ok
|
GCE-Rough-In | 4/12/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Rex Boyles
|
|
|
Bob ###-#### - underground insp. r/i ok u. ground for fiber optic and telco
|
GCE-Rough-In | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Rex Boyles
|
|
|
Bob ###-#### - Underground Insp. r/i secondaries and telco at north end of bldg ok
|
GCE-Rough-In | 4/5/2016 | 4/6/2016 | 4/6/2016 | A | PASS |
Daryl DeGrange
|
|
|
Bob ###-#### - UFER inspection rough-in ok cover concrete encased electrode
|
GCE-Rough-In | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Daryl DeGrange
|
|
|
Bob ###-#### rough-in ok cover north parking lot lighting underground.
|
GCE-Rough-In | 10/13/2016 | 10/13/2016 | | P | |
Mark Moncarr
|
|
|
Bob-###-#### Cover & UG
|