GCM-Final | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | PASS |
Dixie Fellows
|
|
|
Scope: FinalContact: Anne @ ###-####Call in advance
|
GCM-Final | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | FAIL |
Dixie Fellows
|
|
|
chad Phone #: ###-####...was scheduled to meet the home owner but he wouldn't answer the door
|
GCM-Final | 8/30/2010 | 8/31/2010 | 8/31/2010 | A | NH |
Dixie Fellows
|
|
|
chad ###-####...wasn't home so the contractor will reschedule for wed am
|
GCM-Final | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | NH |
Dixie Fellows
|
|
|
homeowner at ###-#### Phone #: ###-####...called and left message..no return call
|