GCM-Final | 6/4/2010 | 6/7/2010 | 6/7/2010 | A | PEND |
Dixie Fellows
|
|
|
Scope of Inspection: Final (Re-Inspection)Contact: April @ ###-####...KITCHEN EQUIPMENT NOT PER CHAPTER 5 OF IMC. NEED AN ENGINEER TO DESIGN A PLAN. GAS WON'T BE TURNED ON UNTIL ALL ISSUES ARE RESOLVED. DIXIE
|
GCM-Pressure Test | 6/3/2010 | 6/4/2010 | 6/7/2010 | A | CANC |
Dixie Fellows
|
|
|
Scope of Inspection: Pressure TestContact: April @ ###-####
|
GCM-Final | 6/4/2010 | 6/4/2010 | 6/4/2010 | P | NR |
Alan Hauser
|
|
|
|
GCM-Final | 6/3/2010 | 6/4/2010 | 6/4/2010 | A | NR |
Alan Hauser
|
|
|
|
GCM-Pressure Test | 6/3/2010 | 6/4/2010 | 6/4/2010 | A | FAIL |
Alan Hauser
|
|
|
pressure has dropped to 4#
|