GCM-Final | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | PASS |
Dixie Fellows
|
|
|
Scope: FinalContact: Brandon @ ###-####
|
GCM-Final | 7/22/2010 | 7/23/2010 | 7/23/2010 | A | FAIL |
Dixie Fellows
|
|
|
Scope: FinalContact: Brandon @ ###-####..w/h terminations to be 36" below eve per manuf on page 30
|
GCM-Final | 7/21/2010 | 7/21/2010 | 7/21/2010 | P | FAIL |
Dixie Fellows
|
|
|
brandon Phone #: ###-####..need to remove duct above garage ceiling..need manuf specs for 2 tankless w/h...extend plumbing vent 3' above furn termination of roof
|