GCM-Final | 8/30/2010 | 8/31/2010 | 8/31/2010 | A | PASS |
Dixie Fellows
|
|
|
Jim ###-####...scope of work was to add a new boiler and upsize meter to 2lb
|
GCM-Final | 8/25/2010 | 8/26/2010 | 8/26/2010 | A | CANC |
Dixie Fellows
|
|
|
Scope: FinalContact: Jim @ ###-####Call in advance...contractor called and cancelled wed pm
|
GCM-Rough In & Pressure Test | 8/24/2010 | 8/25/2010 | 8/25/2010 | A | PASS |
Dixie Fellows
|
|
|
Scope: Rough-In and Pressure TestContact: Jim @ ###-####...60lb gas ok to new boiler..
|