GCM-Final | 11/2/2010 | 11/3/2010 | 11/3/2010 | A | PASS |
Dixie Fellows
|
|
|
Scope: FinalContact: Luke @ ###-####..SIGNED THE CARDS
|
GCM-Rough-in | 10/14/2010 | 10/15/2010 | 10/15/2010 | A | PASS |
Dixie Fellows
|
|
|
Scope: Rough-InContact: Brad @ ###-####..ok to cover lid
|
GCM-Rough-in | 9/1/2010 | 9/2/2010 | 9/2/2010 | A | PART |
Dixie Fellows
|
|
|
duct ok, hard ceiling areas ok for cover, recall when grid is in before tile
|
GCM-Rough-in | 8/26/2010 | 8/27/2010 | 8/27/2010 | A | PART |
Dixie Fellows
|
|
|
Scope: Rough-In (Courtesy Cover)Contact: Brandon @ ###-####..OK TO INSULATE DUCT ABOVE BATHROOMS...LUKE ###-####
|